07840 996627
NE8 – NE11 · Valleys

Leaking Roof Valley — Gateshead

A valley is under more water than any other part of a roof — sometimes twice the annual rainfall of the same area of flat tile. In Gateshead's climate that's a serious volume, and it's why we spec Code 5 as standard rather than Code 4. We're regularly on roofs close to the A1 western bypass, out around Team Valley Trading Estate, through Low Fell and Felling.

  • Code 5 lead as standard for domestic valleys
  • Dry-valley GRP or plastic trough where the client prefers a modern detail
  • Tile-and-a-half cut and clipped at the valley edge (not just mortar-bedded)
  • Underlay taken through the valley continuously — no cut-and-lap under a lead flow
  • Stainless valley clips on exposed pitches
  • Old lead recycled and credited off the invoice where worth doing

Never mortar over a valley

It's the most common bodge we're called to. Mortar bedding into the valley run itself blocks flow, cracks in a year and pushes water sideways under the tiles. If you've been sold that as a 'repair', we can put it right properly. Exposed ridges above the Team Valley catch high cross-winds — mortar-only ridge bedding tends to crack within 8–10 years.

Signs a Gateshead valley is failing

Damp patch on the ceiling below a room-in-roof, staining on a bedroom wall where an internal wall runs under the valley, moss build-up in the valley itself (nothing draining), or a visible crack or lift in the lead when you look up from ground level.

Coverage

NE8 – NE11 in full, direct access off the A1 western bypass. We also cover Newcastle, Birtley.
Related pages

Roof valley repair in Gateshead — FAQs

Can you patch a valley or does it need full replacement?+

Small localised cracks in Code 5 lead can be patched with lead-burn or a lead-flash patch. Anything longer than about 300mm we recommend full replacement — patching a whole run is more work than replacing.

How long does a valley replacement take?+

Single valley (bay or dormer): half a day plus scaffold day. Full valley on a large hipped roof: 1–2 days. Scaffold usually 1–3 days depending on access.

Will the tiles either side get damaged?+

Any that break during removal get replaced from stock — we always allow reclaimed tiles to match age. Included in the quote.

Do you cover Gateshead and surrounding areas?+

Yes — NE8 – NE11, plus Newcastle, Birtley.

Need Roofing Work You Can Rely On?

Contact Stoker Property Solutions for new roofs, flat roofing, repairs and maintenance across Newcastle, Sunderland and the wider North East.

Related pages worth a look

Call Now Free Quote