07840 996627
NE30 · Lead work

Chimney & Abutment Lead Flashing — Tynemouth

Failed flashing shows up as a chimney-breast stain or a slow drip at an extension abutment — usually two or three winters after the last "quick fix". Proper Code 4 dressed into a chased joint and pointed with sand:cement doesn't come back for decades. We're regularly on roofs close to the A1058 Coast Road, through Cullercoats and Preston Village.

  • Code 4 or Code 5 lead as the location demands — no thin turn-up stuff
  • Chased into a fresh mortar joint, not silicone-glued to the render
  • Stepped, soaker and back-gutter details all dressed by hand
  • Sand:cement pointing finish, not mastic
  • Old lead recycled and credited off the invoice where the weight justifies it
  • Patination oil applied to prevent white-carbonate staining on new lead

Where flashing fails on Tynemouth roofs

Chimney back-gutters (short lap, no cricket, mortar-only fillet), abutment flashings on extensions (undersized cover, no upstand behind the render), dormer cheeks (mitred corners cracked), and valley/step flashings on tiled roofs. We check every one on the survey. Heritage stone villas around the Priory, period terraces along Front Street, and detached coastal homes overlooking Longsands. On heritage streets we match Code 5 and hand-form corners rather than using preformed corners — planners and building control both prefer it.

Code 4 vs Code 5 vs Code 6

Code 4 (blue) for standard cover flashings, soakers and short back-gutters. Code 5 (red) for longer runs, exposed elevations and anything a person can walk on. Code 6 (black) for parapets and valleys with heavy flow. We spec by location, not by rule of thumb.

Coverage

NE30 in full, direct access off the A1058 Coast Road. We also cover Whitley Bay, North Shields.
Related pages

Lead flashing replacement in Tynemouth — FAQs

Can you just point the mortar rather than re-lead?+

Only if the lead itself is sound and it's only the joint that's failed. Nine times out of ten the lead has hardened and cracked too — a fresh point over cracked lead lasts one winter.

How long does new lead flashing last?+

30–50 years for Code 4 in a normal exposure. Longer with patination oil applied at install to stop the initial white staining that runs onto tiles below.

Do you cover the chimney pot and cowl too?+

Yes — if the pot needs re-flaunching or a cowl fitting, we price that separately in the quote so you can choose to include it or not.

Which Tynemouth postcodes do you cover?+

NE30 — plus Whitley Bay, North Shields.

Need Roofing Work You Can Rely On?

Contact Stoker Property Solutions for new roofs, flat roofing, repairs and maintenance across Newcastle, Sunderland and the wider North East.

Related pages worth a look

Call Now Free Quote