New uPVC Gutters — Boldon
Every "damp on the outside wall" job in Boldon starts with the gutters. If they overflow, the wall is wet, and no amount of internal decoration fixes it. New gutters, sized right and set at the right fall, is the actual fix. We're regularly on roofs close to the A19, through West Boldon and East Boldon.
- Brackets set at 800mm centres, not the 1200mm many chancers use
- Correct fall to outlet (1:600 minimum) — no ponding, no overflow
- Hoppers to receive downpipes from bays and dormers, not just T-junctions
- 112mm half-round or square-line as standard; 150mm on commercial
- All new fascia-to-gutter joints sealed with EPDM, not silicone
- Downpipes clipped every 1.8m — no wobbling in a gale
Cast-iron vs uPVC vs aluminium
Downpipes to what?
Coverage
Gutter replacement in Boldon — FAQs
How long does a full gutter renewal take?+
Standard semi: one day. Detached with hips and bay: a day and a half. Terrace with rear alley access: one day; front-only if scaffold is needed can be two.
Will you replace the downpipes too?+
Yes, we quote them together — replacing gutter and leaving 30-year-old brittle downpipes is false economy.
Do you offer coloured gutters?+
Standard colours (white, black, brown, grey, cast-iron-effect) at no upcharge. Anthracite grey has become popular in the last five years — happy to spec that.
Do you cover all NE35 – NE36 postcodes?+
Yes — every one, plus surrounding towns like South Shields and Jarrow.
Need Roofing Work You Can Rely On?
Contact Stoker Property Solutions for new roofs, flat roofing, repairs and maintenance across Newcastle, Sunderland and the wider North East.
